Fukushima water tank – holes found
[Photo] 2 holes found in the bottom of 300m3 leakage tank / Entirely deteriorated http://fukushima-diary.com/2013/10/photo-2-holes-found-in-the-bottom-of-300m3-leakage-tank-entirely-deteriorated/ by Mochizuki on October 8th, 2013
Tepco has been dismantling the tank since yesterday that experienced the 300m3 of leakage. The structural flaw may cause other tanks of the same type to leak commonly. Tepco is investigating the potential leaking points.
From their inspection, they found 2 holes around the bolt parts, which are 3mm × 11mm and 3mm × 22mm.
The flange parts were rusting inside and outside. The bottom parts of the tank were found severely deteriorated.
http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_131008_03-j.pdf
http://photo.tepco.co.jp/date/2013/201310-j/131008-01j.html
News is not the truth. It’s a virtual reality that the sponsor wants us to live in.
No comments yet.


Leave a comment