Robots’ limitations exposed in search for melted nuclear fuel in Fukushima

OKUMA, Fukushima — In an attempt to minimize the risk to humans during the search for melted nuclear fuel at the Fukushima No. 1 Nuclear Power Plant, robots have also been deployed to help out with the task.
However, the robots have also encountered some problems. For instance, a Toshiba Corp. robot that was sent in to clear away deposited material inside the containment vessel of the No. 2 reactor failed to clear away much material, and within approximately two hours, its camera had broken.
According to Takahiro Kimoto of plant operator Tokyo Electric Power Co. (TEPCO), “The radiation inside the containment vessel was so intense that the images transmitted back from a camera attached to the robot were pitch black.” This was somewhat disappointing for the team working at the No. 2 reactor because by losing their robotic “eye” inside the containment vessel, they were unable to make the…
View original post 496 more words
No comments yet.

Leave a comment