AEMO’s Integrated System Plan: Does it leave Snowy 2.0 high and dry? — RenewEconomy

Is Snowy 2.0 viable? AEMO’s latest 20 year blueprint suggests the multi-billion dollar pumped hydro scheme will be used a lot less than claimed. The post AEMO’s Integrated System Plan: Does it leave Snowy 2.0 high and dry? appeared first on RenewEconomy.
AEMO’s Integrated System Plan: Does it leave Snowy 2.0 high and dry? — RenewEconomy
No comments yet.

Leave a comment