Antinuclear

Australian news, and some related international items

Images indicate bigger challenge for TEPCO at Fukushima plant

Fukushima 311 Watchdogs

A video taken on Jan. 30 shows the bottom of the No. 2 reactor’s pressure vessel at the Fukushima No. 1 nuclear power plant. Water used to cool the nuclear fuel is dripping, and possible melted fuel is seen strewn on grating for maintenance work. (Provided by Tokyo Electric Power Co.)

If confirmed, the first images of melted nuclear fuel at the Fukushima No. 1 nuclear plant show that Tokyo Electric Power Co. will have a much more difficult time decommissioning the battered facility.

The condition of what is believed to be melted fuel inside the No. 2 reactor at the plant appears far worse than previously thought.

Before the pictures were taken by a remote-controlled video camera on Jan. 30, TEPCO presumed that most of the nuclear fuel at the No. 2 reactor had remained within the reactor’s pressure vessel. That presumption was based on findings of a study…

View original post 354 more words

Advertisements

February 2, 2017 - Posted by | Uncategorized

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: