Former transmission boss joins AEMO to lead Integrated System Plan — RenewEconomy

Former Powerlink boss and AEMC Commissioner will oversee the Integrated System Plan as the national grid hurtles to 100% renewables. The post Former transmission boss joins AEMO to lead Integrated System Plan appeared first on RenewEconomy.
Former transmission boss joins AEMO to lead Integrated System Plan — RenewEconomy
No comments yet.
Leave a Reply