Antinuclear

Australian news, and some related international items

Muscle robots’ being developed to remove debris from Fukushima reactors

Fukushima 311 Watchdogs

Hitachi-GE testing variety of simply structured, radiation-resistant equipment

20170818_Fukushima-reactor_article_main_image.jpgThe Unit 1 reactor building at the Fukushima Dai-ichi nuclear power plant of the Tokyo Electric Power Co. (TEPCO) in Okuma town, Fukushima prefecture, June 21, 2017.

TOKYO — A joint venture between Japanese and American high-technology power houses Hitachi and General Electric is developing special robots for removing nuclear debris from the Fukushima Daiichi nuclear power plant, the most difficult task in decommissioning the plant’s six reactors, three of which suffered core meltdowns in the March 2011 accident.

The machines under development by Hitachi-GE Nuclear Energy are called “muscle robots,” as their hydraulic springs operate like human muscles. The company, based in Hitachi, Ibaraki Prefecture, is stepping up efforts to complete the development project in time for the start of debris removal in 2021.

Hitachi-GE is testing the arms of the robots at a plant of Chugai Technos, a Hiroshima-based engineering…

View original post 290 more words

Advertisements

September 3, 2017 - Posted by | Uncategorized

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: